Skip to content

EPX2 vs EPX3 Adhesive

EPX2 and EPX3 provide the same final installed anchor strength when they are installed correctly. Once cured, both are weather resistant.

The difference is installation. Choose based on job size, weather, temperature, speed, and cost.

AdhesiveBest forMain advantageMain downside
EPX2Dry jobs with a crew, especially larger installsLowest costRequires mixing, can be messy, and is sensitive to water and temperature
EPX3Cold, wet, or variable field conditionsEasiest and widest installation rangeHighest cost

EPX2 is a cement-based adhesive. It is very inexpensive and works well when you have multiple people on site: one person can mix, another can pour, and another can set anchors.

The tradeoff is handling. EPX2 requires mixing, can make a mess, and the mix can be tricky to get right. It also reacts strongly to temperature. It cures slowly in cold weather and very fast in hot weather.

Use EPX2 when:

  • The holes and pavement are dry
  • The ambient temperature is 40F or above
  • Material cost is a major concern
  • You have enough people to mix, pour, and install without rushing

Do not use EPX2 in damp holes, standing water, active rain, or below 40F. If you cannot fully dry the hole, use EPX3 instead.

EPX3 is an acrylic resin adhesive supplied in a cartridge. It is the easiest adhesive to install: use a caulk gun, squeeze the adhesive into the cleaned hole, and set the anchor.

EPX3 has the widest installation range. It can be used in wet conditions and can be installed in much colder weather than EPX2 when the cartridge is warmed before use. It also sets quickly, which helps keep jobs moving.

Use EPX3 when:

  • The job is cold, wet, or unpredictable
  • You want the simplest installation process
  • You are installing a small number of anchors
  • Labor time matters more than adhesive cost

The main downside is cost. EPX3 is much more expensive than EPX2.

Once cured, both adhesives are weather resistant. However, temperature still matters in two different ways: installation temperature affects adhesive handling and curing, while pavement temperature during use affects anchor pull capacity.

  • EPX2 must be installed dry and cannot be installed below 40F.
  • EPX3 can be used in wet and standing water conditions and can be installed down to 14F when handled correctly.

Hot pavement can reduce the holding capacity of a cured anchor independently of adhesive weather resistance. See High Pavement Temperature and Anchor Capacity for guidance.

For detailed cold, wet, and hot weather handling, see Weather and Temperature Installation.

For most dry, planned installations where material cost matters, choose EPX2.

For small jobs, cold weather, wet holes, or the easiest installation, choose EPX3.

No matter which adhesive you use, hole preparation still matters. Clean the hole thoroughly before installing adhesive. See Clean the Hole Before Installing Asphalt Anchors and the Asphalt Anchor Installation Guide.